Belbex.com es ahora LoopNet

Compartir este anuncio

Mensaje

964 caracteres restantes

Parece que se ha producido un error al enviar tu mensaje. Vuelve a intentarlo.

Tu correo electrónico ha sido enviado.

¿Sigues interesado?

Póngase en contacto con los agentes para obtener más información sobre esta propiedad

Parte de la información se ha traducido automáticamente.

Aspectos destacados

  • Future-ready industrial facility in a premier logistics hub with direct access to major transport routes.
  • Ample hardstand and on-site parking designed for operational efficiency.
  • High-clearance warehouse combined with modern two-level office accommodation.

Características

Altura libre
7,49 m (24’7”)
Plazas de parking estándar
19

Espacio disponibles(1)

Mostrar el precio como

  • Espacio
  • Tamaño
  • Duración
  • Precio
  • Uso
  • Acondicionamiento
  • Disponible
  • Planta baja
  • 1.735 m²
  • Negociable
  • Bajo solicitud Bajo solicitud Bajo solicitud Bajo solicitud
  • Nave
  • -
  • 01/09/2026

This property is a brand-new freestanding industrial facility currently under construction in the Australia TradeCoast precinct, one of Brisbane’s most significant logistics and industrial hubs. Scheduled for completion in Q3–Q4 2026, the facility is designed to meet modern warehousing and distribution requirements with a tilt-panel structure and an average internal clearance of 7.5 meters. The building will feature approximately 1,460 m² of warehouse space and 275 m² of two-level corporate office accommodation, providing a functional and efficient layout for future occupiers. The site includes a large hardstand area, a 10-meter crossover for truck access, and 19 on-site car parks, including three undercroft spaces. Its location offers direct connectivity to Brisbane Airport, the Port of Brisbane, and the Gateway Motorway, ensuring streamlined access to major freight corridors. Delivered by Hutchinson Builders, this facility represents an opportunity to secure a high-quality industrial asset in a prime logistics location before completion.

  • Incluye 275 m² de espacio exclusivo para oficinas
Espacio Tamaño Duración Precio Uso Acondicionamiento Disponible
Planta baja 1.735 m² Negociable Bajo solicitud Bajo solicitud Bajo solicitud Bajo solicitud Nave - 01/09/2026

Planta baja

Tamaño
1.735 m²
Duración
Negociable
Precio
Bajo solicitud Bajo solicitud Bajo solicitud Bajo solicitud
Uso
Nave
Acondicionamiento
-
Disponible
01/09/2026

Planta baja

Tamaño 1.735 m²
Duración Negociable
Precio Bajo solicitud
Uso Nave
Acondicionamiento -
Disponible 01/09/2026

This property is a brand-new freestanding industrial facility currently under construction in the Australia TradeCoast precinct, one of Brisbane’s most significant logistics and industrial hubs. Scheduled for completion in Q3–Q4 2026, the facility is designed to meet modern warehousing and distribution requirements with a tilt-panel structure and an average internal clearance of 7.5 meters. The building will feature approximately 1,460 m² of warehouse space and 275 m² of two-level corporate office accommodation, providing a functional and efficient layout for future occupiers. The site includes a large hardstand area, a 10-meter crossover for truck access, and 19 on-site car parks, including three undercroft spaces. Its location offers direct connectivity to Brisbane Airport, the Port of Brisbane, and the Gateway Motorway, ensuring streamlined access to major freight corridors. Delivered by Hutchinson Builders, this facility represents an opportunity to secure a high-quality industrial asset in a prime logistics location before completion.

  • Incluye 275 m² de espacio exclusivo para oficinas

Descripción general del inmueble

The property at 10-14 Culya Street, Pinkenba, is an industrial facility under construction within the Australia TradeCoast precinct. It is approximately 12 kilometers from Brisbane CBD and offers connectivity to Brisbane Airport, the Port of Brisbane, and the Gateway Motorway. The site includes a tilt-panel building with warehouse and office components, a large hardstand, and on-site parking. Completion is scheduled for Q3–Q4 2026.

Información del edificio: almacén

Tamaño del edificio
1.735 m²
Tamaño del terreno
0,35 ha
Año de construcción
2026
  • ID del anuncio: 40126580

  • Fecha de salida al mercado: 13/04/2026

  • Última actualización:

  • Dirección: 10-14 Culya Street, Pinkenba, QLD 4008

Enlace copiado
¡Tu cuenta de LoopNet ha sido creada!

Envíanos tu opinión

Agradecemos tus comentarios sobre cómo mejorar los servicios de LoopNet.
X
{{ getErrorText(feedbackForm.starRating, "clasificación") }}
255 límite de caracteres ({{ remainingChars() }} caractercaracteres restantesobre)
{{ getErrorText(feedbackForm.msg, "clasificación") }}
{{ getErrorText(feedbackForm.fname, "nombre") }}
{{ getErrorText(feedbackForm.lname, "apellido") }}
{{ getErrorText(feedbackForm.phone, "numero de teléfono") }}
{{ getErrorText(feedbackForm.phonex, "anexo") }}
{{ getErrorText(feedbackForm.email, "email") }}